Asih, Hayati Mukti Cost-Volume-Profit Analysis for Uncertain Capacity Planning: A Case Study Paper. UNSPECIFIED.
Text
Bukti review - IEOM Hayati n Chong.pdf Download (617kB) |
Item Type: | Other |
---|---|
Subjects: | A General Works > AC Collections. Series. Collected works |
Divisi / Prodi: | Faculty of Industrial Technology (Fakultas Teknologi Industri) > S1-Industrial Engineering (S1-Teknik Industri) |
Depositing User: | Ph.D. Hayati Mukti Asih |
Date Deposited: | 30 Mar 2023 02:17 |
Last Modified: | 30 Mar 2023 02:45 |
URI: | http://eprints.uad.ac.id/id/eprint/41805 |
Actions (login required)
View Item |